RES developed this repowering project with M&N Wind Power.

RES acted as the Balance Of Plant (BOP) contractor which also included demolition of 354 existing Flowind wind turbines, and substantial restoration and re-vegetation works.

Substantial completion was achieved on schedule in January 1999.

Cameron Ridge

Information on the Project


RES's Role: Developer and BOP construction contractor
Developer: RES and M&N
Owner: Cameron Ridge LLC (FPL)
Installed Capacity: 60.0 MW
Number of Turbines: 80
Turbine Rating: 750 kW
Turbine Type: Micon NM1500
Year of Operation: 1999