» Cameron Ridge
» Pacific Crest
» Llano Estacado
» Woodward Mountain
» King Mountain
» Nine Canyon I
» Nine Canyon II
» Wigton
» Sweetwater II
» Ainsworth
» Hopkins Ridge
» Wild Horse
» Sweetwater 1V(b)
» Marengo I
» White Creek
» Sweetwater V
» Whirlwind
» Nine Canyon III
» Mountain Wind I
» Lone Star
» Pacific Crest
» Llano Estacado
» Woodward Mountain
» King Mountain
» Nine Canyon I
» Nine Canyon II
» Wigton
» Sweetwater II
» Ainsworth
» Hopkins Ridge
» Wild Horse
» Sweetwater 1V(b)
» Marengo I
» White Creek
» Sweetwater V
» Whirlwind
» Nine Canyon III
» Mountain Wind I
» Lone Star

Cameron Ridge Wind Farm
Tehachapi, California
RES developed this repowering project with M&N Wind Power.
RES acted as the Balance Of Plant (BOP) contractor which also included demolition of 354 existing Flowind wind turbines, and substantial restoration and re-vegetation works.
Substantial completion was achieved on schedule in January 1999.

Information on the Project
| RES's Role: | Developer and BOP construction contractor |
| Developer: | RES and M&N |
| Owner: | Cameron Ridge LLC (FPL) |
| Installed Capacity: | 60.0 MW |
| Number of Turbines: | 80 |
| Turbine Rating: | 750 kW |
| Turbine Type: | Micon NM1500 |
| Year of Operation: | 1999 |