RES Americas Inc RES Powering Change
turbine
turbine

Mountain Wind I Wind Farm
Fort Bridger, Wyoming

Mountain Wind I

 

 

Information on the Project


RES's Role: BOP Construction Contractor
Developer: Edison Mission
Owner: Edison Mission
Installed Capacity: 61 MW
Number of Turbines: 29
Turbine Rating: 2100 kW
Turbine Type: Suzlon S88
Year of Operation: 2008