RES Americas Inc RES Powering Change
turbine
turbine

Mountain Wind II Wind Farm
Fort Bridger, Wyoming

 

Mountain Wind II

 

Information on the Project


RES's Role: BOP Construction Contractor
Developer: Edison Mission
Owner: Edison Mission
Installed Capacity: 80 MW
Number of Turbines: 38
Turbine Rating: 2100 kW
Turbine Type: Suzlon S88
Year of Operation: 2008