» Cameron Ridge
» Pacific Crest
» Llano Estacado
» Woodward Mountain
» King Mountain
» Nine Canyon I
» Nine Canyon II
» Wigton
» Sweetwater II
» Ainsworth
» Hopkins Ridge
» Wild Horse
» Sweetwater 1V(b)
» Marengo I
» White Creek
» Sweetwater V
» Whirlwind
» Nine Canyon III
» Mountain Wind I
» Lone Star
» Pacific Crest
» Llano Estacado
» Woodward Mountain
» King Mountain
» Nine Canyon I
» Nine Canyon II
» Wigton
» Sweetwater II
» Ainsworth
» Hopkins Ridge
» Wild Horse
» Sweetwater 1V(b)
» Marengo I
» White Creek
» Sweetwater V
» Whirlwind
» Nine Canyon III
» Mountain Wind I
» Lone Star

Nine Canyon Wind Farm (Phase II)
Tri-Cities, Washington
The 15.6MW extension to the Nine Canyon wind farm was completed in December 2003. It comprises an additional 12 Bonus 1.3MW wind turbines, and brings the total installed capacity at the Nine Canyon site to 63.7MW.
As with Phase I, the extension was built under an Engineering, Procurement & Construction (EPC) contract by RES for Energy Northwest and it achieved substantial completion two weeks ahead of schedule.

Information on the Project
| RES's Role: | EPC construction contractor |
| Developer: | Energy NW |
| Owner: | Energy NW |
| Installed Capacity: | 16 MW |
| Number of Turbines: | 12 |
| Turbine Rating: | 1,300 kW |
| Turbine Type: | Bonus, Active Stall |
| Year of Operation: | 2003 |