RES Americas Inc RES Powering Change
turbine
turbine

Nine Canyon Wind Farm (Phase III)
Tri-Cities, Washington

The second extension to the Nine Canyon wind farm comprised of 32.2MW and brought the total installed capacity at the Nine Canyon site to almost 100MW.

As with both previous phases, the extension was being built under an Engineering, Procurement & Construction (EPC) contract by RES Americas for Energy Northwest and it achieved commercial operations in 2008.

 

Nine Canyon III

 

Information on the Project


RES's Role: EPC construction contractor
Developer: Energy NW
Owner: Energy NW
Installed Capacity: 32 MW
Number of Turbines: 14
Turbine Rating: 2,300 kW
Turbine Type: Siemens 2.3MW MKII
Year of Operation: 2008