Sweetwater Wind Farm (Phase II)
Sweetwater, Texas

As the Balance Of Plant (BOP) construction contractor RES Americas was responsible for the design and construction (including turbine erection) of this 91.5MW wind farm.

The project was constructed from start to finish, including installation of two substations and eight miles of overhead line, within four and a half months of notice to proceed.

It became operational in February 2005.

Sweetwater II

Information on the Project


RES's Role: BOP construction contractor
Developer: DKR
Owner: B&B and Catamount
Installed Capacity: 92 MW
Number of Turbines: 61
Turbine Rating: 1,500 kW
Turbine Type: GE 1.5s
Year of Operation: 2005