» Cameron Ridge
» Pacific Crest
» Llano Estacado
» Woodward Mountain
» King Mountain
» Nine Canyon I
» Nine Canyon II
» Wigton
» Sweetwater II
» Ainsworth
» Hopkins Ridge
» Wild Horse
» Sweetwater 1V(b)
» Marengo I
» White Creek
» Sweetwater V
» Whirlwind
» Nine Canyon III
» Mountain Wind I
» Lone Star
» Pacific Crest
» Llano Estacado
» Woodward Mountain
» King Mountain
» Nine Canyon I
» Nine Canyon II
» Wigton
» Sweetwater II
» Ainsworth
» Hopkins Ridge
» Wild Horse
» Sweetwater 1V(b)
» Marengo I
» White Creek
» Sweetwater V
» Whirlwind
» Nine Canyon III
» Mountain Wind I
» Lone Star

Sweetwater Wind Farm (Phase II)
Sweetwater, Texas
As the Balance Of Plant (BOP) construction contractor RES were responsible for the design and construction (including turbine erection) of this 91.5MW wind farm.
The project was constructed from start to finish, including installation of two substations and eight miles of overhead line, within four and a half months of notice to proceed.
It became operational in February 2005.

Information on the Project
| RES's Role: | BOP construction contractor |
| Developer: | DKR |
| Owner: | B&B and Catamount |
| Installed Capacity: | 92 MW |
| Number of Turbines: | 61 |
| Turbine Rating: | 1,500 kW |
| Turbine Type: | GE 1.5s |
| Year of Operation: | 2005 |