Powering Tomorrows WorldRES Americas IncAmericas Inc.
turbine
turbine
location
Sweetwater Wind Farm (Phase IVb)
Sweetwater, Texas

RES is providing construction services on this development for the second time, having previously constructed Phase II.

The work is being carried out under a full Engineering, Procurement & Construction (EPC) contract.

Sweetwater V

Information on the Project


RES's Role: EPC construction contractor
Developer: DKR
Owner: Babcock and Brown & Catamount
Installed Capacity: 106 MW
Number of Turbines: 46
Turbine Rating: 2,300 kW
Turbine Type: Siemens 2.3MW MKII
Year of Operation: 2007